Abstract
This study addresses major challenges in hot-weather concreting under extreme Persian Gulf conditions (27–32°C, <20% RH, evaporation >8 mm/h), including rapid evaporation, batching inconsistencies, delayed pozzolanic activation, and high field variability that often lead to overestimated uniformity in lab studies (typical CoV 4–8%). A 300 m³ full-scale pour of C25/C30 mixes with 2.5% Power Gel microsilica was monitored at the Bidboland PDH unit. Ten systematic batches were sampled for compressive strength (7/28 days), water permeability, slump, air content, and temperature. Data were analyzed using descriptive statistics, ANOVA, REML variance partitioning, regression (R²=0.841 for 7-28 day correlation), and RMSE. 28-day strength averaged 31.05 MPa with exceptionally low CoV of 2.16% (lowest reported in similar field conditions), water penetration <30 mm (C25) and <20 mm (C30), and concrete temperature maintained <32°C despite extremes. This provides the first documented field evidence of "Excellent" quality control (CoV <3% per ACI 214R-11, reapproved 2019) in full-scale Persian Gulf hot-dry climate, bridging the theory-practice gap. The optimized protocol (equivalent 10% microsilica + w/c ≤0.46 + temperature control ≤32°C) enables exceptional uniformity and >50-year durability in aggressive environments worldwide.
Keywords
Subjects